Current Projects

Construction, Closures & Current Projects

Capital Projects Map

Open Full Project Tracker

Pulaski Park

Northwest Milwaukee Trails Plan

The Northwest Trail Connections Plan will help Milwaukee County understand where more trails are needed, and find places where new trails can go on Milwaukee's North-west side.

During the planning process we want to learn from you about your experiences and the routes you take biking or walking to the Oak Leaf Trail. Together, we will find places where new trails or parkways can link to existing trail networks.

View the Current Plan

Lake Park Arch Bridge at Ravine Road

Lake Park Ravine Road Bridge

Preparatory work for construction of the Ravine Road Bridge is scheduled to begin the week of Sept. 13. Initial work will include removing trees and setting up scaffolding. Construction will  follow.  

Project work has been funded through a $2M Transportation Alternatives Program grant from the Wisconsin Department of Transportation.

June 17, 2020: Public Information Online Meeting/Presentation

2021-2022 Construction Key Points

  • Contractor bids received and opened March 24
  • Construction, including staging, expected to begin in May
  • Construction expected to be substantially complete by August 2022
  • Events at Lake Park Bistro and other events in Lake Park will be coordinated with the contractor to minimize any disruption due to equipment noise and similar impacts

View Project Description

View June 17, 2020 Public Meeting Agenda

View June 17, 2020 Public Online Meeting

View June 17, 2020 Public Meeting Presentation (pdf)

View Construction Site Boundaries

Kosciuszko Community Center

Kosciuszko Community Center

Open House for Master Plan Development

In-Person: Sept. 28 at 5:30 p.m.
Kosciuszko Community Center, 2201 S. Seventh St.

Virtual: Sept. 30 at 4 p.m.
Zoom Meeting: https://us06web.zoom.us/j/81080212795
The Zoom meeting ID is 810 8021 2795.
or
Join by Phone: (312) 626-6799 
 

Milwaukee County has partnered with Quorum Architects to provide a series of public engagement efforts with the people who use the Kosciuszko Community Center, and the community surrounding it. The purpose of this study is to:

  • Get feedback on the programs and services offered, via survey and open house
  • Evaluate the physical building as well as the financial and economic impact of future updates to the center
  • Design concept plans, incorporating stakeholder feedback into the master plan
  • Provide a final report to the County for professional recommendations and next steps

Take the Online Survey 
 

 

Partnership with MMSD for Kletzsch Dam Fish Passage & Milwaukee Estuary Area of Concern (AOC)

Milwaukee County has partnered with Milwaukee Metropolitan Sewerage District (MMSD) to achieve Area of Concern goals related to the Kletzsch Dam Fish Passage Project. MMSD is working with contractor Inter-Fluve, Milwaukee County Parks, and WDNR to explore the community preference for east side fish passage. The project will:

  • Address required dam repairs
  • Improve in-river and riparian corridor habitat
  • Provide fish passage for native species within the Milwaukee Estuary AOC

If land can be acquired and the project challenges can be overcome, MMSD will take the lead on implementing fish passage design and construction, along with the dam repairs.

Milwaukee County will retain ownership of the dam and fishway and will be responsible for all future maintenance.

For updates on the Kletzsch Dam Fish Passage and other AOC projects connect with the Waterway Restoration Partnership. 

Email to Sign up for Updates

 

 

 

The Dock plans

Bradford Beach Concessions Proposal

The food and drink concessionaire at Bradford Beach, owners of the Dock, are proposing to enhance the underused second-level of the Bradford Beach bathhouse with additional seating and a modular container bar.

The plans for the upgrades have been reviewed by the City of Milwaukee, the Milwaukee Historical Preservation Committee and the Lakefront Development Advisory Committee (LDAC). Milwaukee County Parks will review the plans in spring 2021.

Proposal Key Points

  • The bathhouse has been used for food and drink operations for the past 15 years
  • As part of the contract, the Dock will fund a minimum of $100,000 toward repairs for the 70-year-old bathhouse building
  • The modular bar is designed to be removed when the Dock's lease of the public building ends
  • Access to the upper level will remain open to the public

View Building Plans

View LDAC Review

Oak Leaf Trail - Zip Line Sink Hole

Oak Leaf Trail Zip Line Culvert Replacement

Milwaukee County is moving forward with replacement of the culvert under the Oak Leaf Trail (OLT) Zip Line where a sink hole has developed. The sink hole is north of Silver Spring Road and west of Green Bay Road in the City of Glendale. The Zip Line is one of the most popular segments of the OLT, with average usership of over 350,000 trips a year. Currently, the trail is closed, with a detour running parallel. Construction will take place in late summer/early fall.

After viewing the Digital Information Meeting, the Public is invited to comment through Friday, May 28 at 5 p.m.

Digital Information Meeting

 

McKinley Flushing Channel Reconstruction

McKinley Flushing Channel Reconstruction

McKinley Flushing Channel Reconstruction

Presentation & Public Comment

Consultants recently completed an engineering study of the McKinley Flushing Channel, which is in a state of significant deterioration and in need of rehabilitation. The channel currently serves as a navigation way, provides dockage and serves boating operations at the Milwaukee Yacht Club.

A project team is developing plans for reconstructing the channel walls, envisioned as primarily steel sheet pile with a concrete cap and railings. A portion of the historic channel walls will be reconstructed to tie into the headwall of the channel reconstructed by MMSD in 1996. A walkway along the west side of the channel will provide a connection to the McKinley Marina walkway system.

The public was invited to submit comments on the project through Feb. 19.

View Presentation Video

View Presentation Slides 

Grant Park - need for paving

Grant Park

North Access Roads/Parking Lots 

Grant Park's northernmost parkway drives and parking lots are severely degraded, indicating the pavement has reached the end of its useful life.

Phased reconstruction will address the area from the northern park entrance (Lake Drive between Badger Avenue and Brookdale Court) eastward to the parking lot serving picnic areas (#7 – #9), and southward to the Wil-O-Way Grant facility. During paving operations, traffic on the Oak Leaf Trail will be rerouted. Reconstruction will not affect southern Grant Park facilities such as the golf course.

Construction, scheduled to begin in late spring, will consist of pulverizing existing asphalt, re-grading, and adding new asphalt pavement, concrete walk, curb and gutter, and pervious pavers. Construction will be substantially complete by fall, when turf restoration will occur.

View the Site Plan

View the Detour Plan

View the Capital Improvements Budget

Underwood Creek Parkway - need for paving

Underwood Creek Parkway
Road Replacement

Underwood Creek Parkway from West Bluemound Road to North 119th Street in Wauwatosa is severely deteriorated, with cracked and heaving pavement that is hazardous for vehicles and bicycles. This segment of parkway has received a rating of 26 out of 100.

Replacement work consists of removing the existing asphalt surface and adding new concrete curb and gutter, concrete ribbon, new asphalt surface, LED lighting, new drainage structures, and storm sewer. Storm water best management practices, green infrastruture and natural areas restoration will be incorporated where applicable. In addition, sustainable practices may include reprocessed, reclaimed, or salvaged material in mixes for the surface, binder, and base courses of the pavement.

As a shared-use roadway, the parkway was designed to the Wisconsin Bicycle Facility Handbook Guidelines. The project will improve access to the existing Oak Leaf Trail, feature new OLT wayfinding signage and have a new trail counter.

Construction of the project is scheduled to begin on or after July 6 and will be substantially complete in fall.

View the Detour Plan

View the Capital Improvements Budget

 

Washington Park Drainage & Sports Field Improvements

Washington Park Drainage & Sports Field Improvements

In Summer 2020, the northeast corner of Washington Park was regraded and reseeded to address drainage issues and to improve the area for soccer fields or other field activities. The seven-acre area is the location of former baseball fields and is currently used for soccer. The majority of work on the project was completed in Fall 2020, but the area will remain out of service well into 2021 to allow the new turf to fully develop.

South Shore Beach Study

As part of continued upgrades to Shore Shore Park, all of which are designed to improve water quality, four design concepts to move the South Shore Beach were proposed. Consultants completed their report, construction drawings and specifications in 2019.

View Proposed Designs

View Project Update (12/02)

McKinley Marina Upgrade

Upgrades to McKinley Marina took place from August - November 2019.

The project, supported in part by grants from Fund for Lake Michigan and Milwaukee Metropolitan Sewerage District, include a new entry and marina drive configuration with dedicated turn lanes onto Lincoln Memorial Drive; reconstructed parking lots; new walkways; enhanced stormwater management through the use of permeable pavers and bio-infiltration basins; installation of new lighting, trees and native landscaping; and upgrades to gas and electrical utilities.

Construction will take place in three stages to keep entry open to the marina boat-launching and parking areas during the project. One entry lane and one exit lane will remain in place throughout the project. However, parking capacity will be diminished over the course of the project.

This phase of the project did not impact the existing boat launches and piers, boat trailer parking, the fish cleaning facility or dry boat storage; those elements will be part of future phases of construction. The 2019 – 2020 construction is Phase 1 of a planned three-phase project to fully upgrade the marina facility.

View Phase I Details

 

Small Cell / Wireless Facilities

Milwaukee County Parks is reviewing proposals for small cell or wireless facilities. The streamlined application process allows the department to ensure limited negative impact to parklands. Use the links to see locations of project proposals that have been reviewed. Sites under review may include multiple options.

View the Full-Screen Map App

Request a Project

Parks Small Cell Facility Guidlines

The guidelines document linked below details General Requirements, Aesthetics, Location, and Installation Type.

Get Details on All the Guidelines

Dineen Park Upgrades

The Dineen Park Stormwater Detention and Park Improvements Project, led by the City of Milwaukee, consists of a 7-acre stormwater pond, improved walking paths, a new community playground, a 16- by 28-foot picnic shelter, a reconstructed 350-foot baseball field, a redesigned 18-hole disc golf course, improved fishing overlook, updated pedestrian lighting, and native plantings and new trees throughout the park. 

The majority of the project was completed in late 2019 with some minor landscape work carrying over to spring of 2020. In fall, vegetation was established, with measures taken to keep foot traffic off the site. Bridge work also was done within the project boundaries, and fencing remained in place until late 2020.

Lagoon dredging and channel stabilization began in November 2020, with the lagoon and area to the east fenced off until work is complete in summer. 

For the safety of the local residents and workers, access is restricted to most of the park during construction. Temporary traffic signs are in place as needed, and construction vehicles use city streets.

Access to the community room, splash pad, and basketball and tennis courts on the west side of the park will remain open during construction.

 

MILWAUKEE COUNTY PARKS

9480 W. Watertown Plank Road
Wauwatosa, WI 53226
(414) 257-PARK (7275)


Connect with us on Nextdoor

RENTAL GUIDE

2020 rentals guide

This site is powered by the Northwoods Titan Content Management System

Menu

X