WT0155011 Fond Du Lac Garage HVAC Ventilation and Exhaust
The HVAC equipment for the Fond Du Lac Bus garage will be replaced and modernized. This project includes buildings 104 (A, B, C, D, and E), building 103/103A, and 102. General scope includes demolition and removal of existing rooftop exhaust fans, make-up air units and other air handlers, gas-fired unit heaters and related infrastructure detailed in the drawings and specifications. Replacement equipment will be installed as scheduled and specified. Support electrical, structural, and control systems to be modified to support the new equipment. Bidding document distribution will be online in Bid Express internet Bidding System at https://www.bidexpress.com/businesses/24937/home
Mandatory Pre-Bid Meeting: on Tuesday, August 19th, from 11:00AM to 12:00PM. A site walk will follow immediately at the project location, 3343 W. Fond Du Lac Ave, from 12:00PM to 1:00PM. Bids are to be completed online in Bid Express internet Bidding System at https://www.bidexpress.com/businesses/24937/home
Bids are Due: 09/10/2025, no later than at 2:00 PM.
Project Contact: Mike Sheehan
Contact Email: [email protected]
