O889-20190: Marcus Center For the Performing Arts Pedestrian Pavement Replacement
Work consists of reconstructing the east/main entrance to the Marcus Center and along the Milwaukee River/west side of the Peck Pavilion. Safety bollard, cable barrier, and decorative colored concrete will be utilized as indicated in the project Bid documents.
Pre-Bid Meeting: One Pre-Bid Meeting will take place on July 14, 2021 at 1:00 PM at the Marcus Center (outside under the main entrance canopy along North Water Street) 929 North Water Street, Milwaukee, WI 53202
Bids are to be completed online in Bid Express internet Bidding System at https://www.bidexpress.com/businesses/24937/home no later than 2:00 PM., July 21, 2021.
