A299: RFP TXY M Realignment (TXY A Extension) – Construction Material Testing
Milwaukee Mitchell International Airport and Milwaukee County Department of Administrative Services are requesting a proposal to provide materials testing services for the proposed removal and realignment of Taxiway M at MKE. Construction is anticipated April through November 2021 and 2022. The project has been designed to FAA specifications and involves testing of compacted soil, disposed soil, concrete, econocrete, and asphalt. Proposals are due March 3, 2021.
There is an optional pre-proposal meeting on Tuesday February 23rd, 2021 at 10:30am in the Maitland Conference Room located in the Main Terminal. (Located before security in hallway behind Museum/USO) Masks are required. IMPORTANT: Please reserve a spot in advance by emailing: [email protected] by 12pm on 2/22/2021. If you do not reserve a spot, you will be permitted to attend only if space is available below room capacity. Virtual attendance via internet will be offered and encouraged. Login instructions will be provided when reserving a spot. Attendee questions and attendance sheets will be published as an addendum.
The complete request for proposal is located on Milwaukee County’s RFP website here: https://county.milwaukee.gov/EN/Administrative-Services/Bids-and-RFPs. Please direct any questions to Ryan Donnelly at 414-522-6638 [email protected].
Submit four copies of the proposal, sealed in an envelope or equivalent, no later than March 3rd by 2:00 p.m. Friday, March 5, 2021 at 2:00 PM.
The proposals shall be addressed and submitted to:
Ryan Donnelly - Engineer
Milwaukee Mitchell International Airport (MKE)
5300 S. Howell Avenue
Administration Office room A260
Milwaukee, WI 53207
Or by email: [email protected]
Attachement 5: https://mitchellairport-my.sharepoint.com/:f:/p/dolivera/ErHjONS7TLxHrDQYxwrSoKAB1BIwPlXkVNiKvep2O7QA2g?e=orCdX7
