A266-20104: RFP GMIA Electrical Switchgear Replacement Terminal
The Milwaukee County Department of Administrative Services is requesting a proposal to provide professional engineering services for the planning and design for the replacement of Electrical Switchgear in the main terminal at General Mitchell Airport. Pre-Proposal Meeting on January 9, 2020 at 9:00am. Meet in the Sijan conference room located in the Airport Terminal Mall behind the new Summerfest store. 5300 S. Howell Avenue, Milwaukee.
Proposals Due: January 29, 2020 by 2:00pm to the attention of:
Mary Turner
GMIA Engineering Department
Administration Building Room A260
5300 S. Howell Avenue
Milwaukee, WI 53207
