A246-18004-01: General Mitchell International Airport Airfield Pavement Rehabilitation-2018 (South Ramp)
This project includes the rehabilitation of a portion of the south aircraft apron at General International Airport. Rehabilitation includes concrete removal/replacement, concrete patching, partial depth joint replacement, and joint route and reseal. Pre-Bid Meeting: Wednesday, June 20, 2018 at 8:45 a.m. Meet in the Hardie Conference Room, in the GMIA upper level administration wing, 5300 S. Howell Ave., Milwaukee, WI.
Bids Due: June 27, 2018 at 2:00 P.M.
Project Contact: Anthony Raab
Contact Phone: (414) 747-5320
Contact Email: [email protected]
