GMIA International Arrivals Building Exterior Wall Repair

General Mitchell International Airport

International Arrivals Building

Exterior Wall Repair

 

Project No.: 5051-18018

 

Contract 1: Exterior Wall Repair

Work of the project consists of removing existing damaged exterior wall panel and adjacent material components and replacing with new exterior wall panel and components with new panel and adjacent material components to match existing surfaces as indicated on Project Bidding Documents.

 

MANDATORY Pre-bid Meeting: June 6, 2018 at 10:00 A.M., meet in Hardie Conference Room at General Mitchell International Airport, Upper Level Concourse C, Airport Engineering, Department of Administrative Services, 5300 South Howell Avenue, Milwaukee, WI

 

Bids Due: June 13, 2018 at 2:00 P.M.

 

**NOTE: Bidding documents can be viewed and purchased online in the A/E Graphics Public Planroom at www.aegraphics.com. Follow the Online Planroom link on this home page. Contact Steve Wellman, Project Document Distribution Administrator, at 262-649-3965 or stevew@aegraphics.com for assistance.

 

 

Project Contact: Amir Adam

Contact Phone: 414-278-4861

Contact Email: amir.adam@milwaukeecountywi.gov

 

 

This site is powered by the Northwoods Titan Content Management System