GMIA Airfield Pavement Rehabilitation 2018 (South Ramp)

General Mitchell International Airport 

Airfield Pavement Rehabilitation – 2018 (South Ramp)

 

Project Number: A246-18004-01

 

Contract Description: This project includes the rehabilitation of a portion of the south aircraft apron at General Mitchell international Airport. Rehabilitation includes concrete removal/replacement, concrete patching, partial depth joint replacement, and joint route and reseal.

 

Pre-Bid Meeting: Wednesday 6/20/2018 at 8:45AM. Meet in the Hardie Conference Room, in the GMIA upper level administration wing, 5300 S Howell Ave, Milwaukee, Wisconsin.

 

Bids Due: June 27, 2018 at 2 P.M.

 

** NOTE: Bidding documents can be viewed and purchased online in the A/E Graphics Public Planroom at www.aegraphics.com. Follow the Online Planroom link on this home page. Contact Steve Wellman, Project Document Distribution Administrator, at 262-649-3965 or stevew@aegraphics.com for assistance. 

 

Project Contact: Anthony Raab

Contact Phone: 414-747-5320

Contact Email: araab@mitchellairport.com

 

This site is powered by the Northwoods Titan Content Management System